Right lower leg sub assy drawings

Images that show how the right lower leg component is attached together in a functional position.
Right lower leg sub assy drawings can be determined necessary to enable the proper dimensions for the components of the lower clamping bracket and the proper position for welding pipe and lower inner vertical clamping bracket to the cantilever in order to create conformity with one another
Figure 4.8 Right lower leg sub assy drawings
4.1.2.7 Frame cover sub assy drawings
Images that show how the frame is attached with leg cover sub assy in their functional status.
Frame cover sub assy drawings necessary for the proper dimensions can be determined to frame the cover and bending the right profile to make it happen conformity with each other
Figure 4.9 Frame cover sub assy drawings
4.1.2.8 Cable channel end plate sub-assy drawings
Images that show how the cable channel end plate component sub assy drawings mounted together in a functional position.
Cable channel end plate sub-assy drawings can be determined necessary for the proper dimensions for the components of end plate and the exact position of the hole to the outer upper vertical pipe and horizontal pipe to fit with one another occurs
Figure 4.10 Cable channel end plate sub-assy drawings
4.1.2.9 Longitudinal beam sub assy drawings
Images that show how the longitudinal component sub assy drawings mounted together in their functional status.
Longitudinal sub assy drawings can be determined necessary for the proper dimensions for the components of the longitudinal beam and the exact position of the hole to the upper horizontal pipe to fit with one another occurs
Figure 4.11 Longitudinal beam sub assy drawings
Nut plate and 4.1.2.10 sub asyy drawing
Images that show how the components of the sub assy drawing nut plate mounted together in a functional position.
Nut plate sub-assy drawings can be determined necessary for the proper dimensions for the component plate and nut to the proper position of the hole for the nut plate and the upper horizontal pipe, and welding positions for suitability to one another occurs
Figure 4.12 End of sub asyy plate drawing
4.1.2.11 Pastick cover sub assy drawings
Images that show how the plastic cover sub assy drawings mounted together in a functional position.
Plastic cover sub assy drawings can be determined necessary for the proper dimensions for the cover and the plastic component of the right hole position for the upper horizontal pipe to happen suitability to each other.
Figure 4.13 Plastic cover sub asyy drawing
Upper 4.1.2.12 plug sub assy drawings
Images that show how the component sub-assy upper plug attached drawing together in their functional status.
Upper plug sub assy drawings can be determined necessary for the proper dimensions for the upper component compatibility with a plug for an upper horizontal pipe.
Figure 4.14 Upper sub assy plug drawing
Foot 4.1.2.13 plug sub assy drawings
Images that show how the components plug foot sub assy drawings attached together in a functional position.
Foot plug sub assy drawings can be determined necessary for the proper dimensions for the components to make it happen foot plug compatibility with cantilever.
Figure 4.15 Foot plug sub assy drawings


  • Read more........
  • Part Drawing

    4.1.3 Part Drawing
    Function of the Part Drawing is an audit check suitability dimension in the calculation, knowing the material needs, the process used.
    4.1.3.1 Lower clamping bracket
    The execution is used:
    - Shearing is the process of cutting sheets of plate using two cutting punch and dies, only to produce two parts and produces no dust or Bram
    - Pearching is the process of making a hole in the form of circles or other shapes.
    - Notching is the process of cutting the edge which does not happen all the cutting edge, only occur in two or three sides.
    - Is the formation of sheets of plate bending by pressing the appropriate angle we want. Pemuluran only occurs in regions penekukan axis (bending axist).
    4.1.3.1.1 Calculation of arch length and width of the cover frame
    The formula used to calculate the length:
    (Donaldson, Cyril, 1983; 737)
    Description:
    B: length of arc on the neutral axis (mm)
    : Bending angle in degree
    t: thickness of material (cm)
    Rd: Radius
    K: constant for the location of neutral axis
    to Rd ≤ 2t, k = 0.33
    Rd ≤ 2t, k = 0.5
    Wide expanse
    Given:
    Answer:
    So the size expanse before penekukan process are:
    Determine the point of bending:
    Checking stretch at point bending
    Machines used:
    - Machine Cut (Shearing).
    - CNC Punching Machine / Dies.
    - CNC Bending Machine
    - Press Brake Machine
    4.1.3.1.2 Calculation of Cut Style
    Style for the cutting process is calculated using the formula:
    (Luchinger, HR, 1984: 93-112)
    Description:
    Fp: Style cut (N)
    L: Length of the cut (mm)
    t: thickness of material (mm)
    σ: tensile stress material (N/mm2)
    For the formula used to calculate the bending force
    (Luchinger, H.R. 1984: 93-112)
    Description:
    Fb: bending force (N)
    L: Length of bending (mm)
    t: thickness of bending (mm)
    σt: tensile material:?
    Penekukan style in the mold
    where:
    t: plate thickness: 0.8
    W: width of die (die opening): 1.6



  • Read more........
  • CHAPTER III CONCEPT DESIGN

    Designing Work Table, adjustable height

    (Height Adjustment Table)


    3.1 Duties

    Designing a Work Table, which could give comfort to the wearer.


    2.3 Translation Task (Clarification of Task)

    3.2.1 Background Design

    In general, people who work in offices spend more time behind a desk. One thing that is done routinely for years - years that surely lead to saturation.

    But on the other hand, the demands of the workload often makes an employee can not take a break and without conscious waktupun passed quickly.

    Departure from the mentioned problems, the authors design a desk that used to keep the wearer comfortable does not feel tired as this may affect the working produktivas. Here functions are preferred, then a design to follow the function, though convenient to use the desk to be adjusted with the working atmosphere had to be done the wearer to support their work.



    3.2.2 List of the Will

    Before we reach the specifications, we do not yet know the outlines of how the form of an adjustable desk height and what will be achieved with the existence of such a desk.

    Therefore compiled a list of wishes. List will be listed first and then randomly arranged in a systematic and ultimately included in a format called specifications.

    The first stage collected the desired ideas, the situation is still not regular, those ideas are as follows:



    a. Table convenient to use.
    b. Adjustable table height.
    c. Easily assembled and disassembled.
    d. Save space, the table does not take up much space.
    e. Ancillary components are easily replaced, compact and lightweight.
    f. Construction cost is not expensive.
    g. In making a lot of absorbing labor.
    h. Dependence on foreign technology to a minimum.
    i. Can be made in bulk.
    j. Forces and moments is used as efficiently as possible.
    k. In the attempt is not too complex.
    l. Relatively easy operation.
    m. Can be operated by one person.
    n. Safe for users.
    o. Maintenance is easy.
    p. Meet the criteria of beauty.
    q. Can be developed as needed.
    r. Easy to move, move.
    s. Dibengkel medium can be made.
    t. In the event of damage can be repaired in place.
    u. Framework must be robust.
    v. Resistant to corrosion.
    w. Materials available in the country.

    All data related to the task, namely solving goals, characteristics that must be owned, definition fully and clearly the will of the list

  • Read more........
  • Step 2.3.2 - work step in the VDI 2221


    Overall employment measures contained in the 2221 VDI consists of 7 (seven) phases, which are grouped into 4 (four) phases, namely:


    1. Translation Task (Clarification of Task)


    Translation of this task includes information on problems and constraints faced. Then compiled a list of requirements regarding the draft will be made.


    2. Determination Concept Design (Conceptual Design)


    Determination Concept Design work includes three steps, namely:


    2.1 Defining Functions and Structure.


    2.2 Finding Solutions Principle and structure.


    2.3 Describing a variant that can be realized.


    3. The realization of the design (Embodiment Design)


    In realization of this design begins by decomposing the design in the modules is followed by the initial design and the design finished.
    4. The Design Details (Detail Design)
    Detailed designing is the design process in the form of images. Which includes images and detailed images composed including parts lists, material specifications, tolerances and many others. In this phase all the work so that manufacture of the product can be documented by the operator or engineer implemented other appointed.
    Overall employment measures contained within the VDI 2221 consisted of 7 (seven) phases, the presence of 7 (seven) the results of the work.
    The seven steps are:
    2.3.2.1 Translation Task (Clarification of Task)
    In step translation work is done The task formulation and a list of requirements will be adjusted with the consumer and the designer, who is expected to be fulfilled by the final solution. This information would be a reference preparation of specifications.
    Specification is a list that contains terms that are expected to be fulfilled by the concept of being manufactured.
    To facilitate the preparation of specifications, it can be done by reviewing certain aspects, such as aspects of geometry, kinematics, force, energy and so forth. From these aspects can described the relevant terms, then formulate the tasks that must be faced, so to be in accordance with a designer sunglasses.
    This specification is an important document which became the basis to carry out other work steps. Therefore, the specification should always be reviewed and updated.



  • Read more........
  • abstraction and formulation


    Once the specification is obtained, then the measures of abstraction and formulation, which aims to determine which parts of the specification which is an important part and are generally accepted.


    During the steps of abstraction and formulation, the important thing to note is that distinguishes a requirement, whether as a demand (Demand) or desire (Wishes)


    Demand (requirement) is requirements must be fulfilled in every condition, or in other words if the conditions are not met then the design to be false / failure.


    Whises is desired requirements when possible. For example, a requirement which requires high cost, without giving effect great technique, so these requirements can be removed / ignored.


    This made the formulation of action steps that will be adjusted with the consumer and / or part wishes Production Planning (Product Planning Department)


    The works performed include:


    a) Gather information / data associated with the planning, checking any constraints faced.
    b) Checking the will-the will of others who can support their work.
    c) Adding a specific will of the company
    d) Formulate a task that faced so be in accordance with designer sunglasses.
    The work is the list obtained by the Will / requirements list. This will list should not be bound by the solution (the solution)
    List of the will is an important document, a basic step in executing other work. Hence the will of the list should always be reviewed and updated. Important discoveries may arise in the design process as a result of modifications or additions to the list will.
    The importance of the list will cause the handle must be orderly and systematic. List of the will which has been handled regularly and systematically in a format called specifications.
    STEP 2 After specifications are obtained carried abstraction and formulation.
    The purpose of abstraction is to determine which parts of the specification which is an important part and are generally accepted.
    Abstraction and formulation will make it easier to determine the functions and structure functions.
    Abstraction and the formulation is as follows:
    1. Desire / whises omitted.
    2. Imperatives / Demands that does not determine the function of temporarily discarded.
    3. Quantitative scale was changed to a qualitative scale.
    4. Formulate abstraction 1-3.
    5. Formulate a solution abstractions 4


  • Read more........
  •  